Evening time Noise Monitoring Results | |||||||||||||
Station M6a, Aegean Terrace | |||||||||||||
Date | Start Time | End Time | Weather | Noise level (dB(A)) | Major Construction Noise Source(s) Observed | Other Noise Source(s) Observed | Remarks | Temp. (°C) | Wind Speed (m/s) | Noise Meter Model / ID | Calibrator Model / ID | ||
Leq | L10 | L90 | |||||||||||
03/04/14-a | 22:45 | 22:50 | Fine | 45 | 46 | 42 | Works inside tunnel | Local traffics of Aegean Terence | According to
contractor, general construction works was in process accordance to
CNP. Free-field measurement, +3dB correction. |
19.6 | <5 | B&K 2238 S/N : 2800932 | B&K 4231 S/N: 3003246 |
03/04/14-b | 22:50 | 22:55 | Fine | 46 | 49 | 42 | 19.6 | <5 | |||||
03/04/14-c | 22:55 | 23:00 | Fine | 49 | 51 | 46 | 19.6 | <5 | |||||
03-Apr-14 | 22:45 | 23:00 | Fine | 50 | 52 | 47 | Works inside tunnel | Local traffics of Aegean Terence | According to contractor, general construction works was in
process accordance to CNP. Free-field measurement, +3dB correction. |
19.6 | <5 | B&K 2238 S/N : 2800932 | B&K 4231 S/N: 3003246 |
29/04/14-a | 22:45 | 22:50 | Fine | 46 | 49 | 43 | Works inside tunnel | Local traffics of Aegean Terence | According
to contractor, general construction works was in process accordance to
CNP. Free-field measurement, +3dB correction. |
19.6 | <5 | B&K 2238 S/N : 2800932 | B&K 4231 S/N: 3003246 |
29/04/14-b | 22:50 | 22:55 | Fine | 46 | 49 | 42 | 19.6 | <5 | |||||
29/04/14-c | 22:55 | 23:00 | Fine | 45 | 47 | 43 | 19.6 | <5 | |||||
29-Apr-14 | 22:45 | 23:00 | Fine | 49 | 51 | 45 | Works inside tunnel | Local traffics of Aegean Terence | According to contractor, general construction works was in
process accordance to CNP. Free-field measurement, +3dB correction. |
19.6 | <5 | B&K 2238 S/N : 2800932 | B&K 4231 S/N: 3003246 |
Average | 47 | ||||||||||||
Minimum | 45 | ||||||||||||
Maximum | 50 | ||||||||||||